C/o. gabion wall from Km 6/400 and Km 7/300 to 7/500 of Calingapuram – srikakulam parvathipuram road in srikakulam District.
Location:- Parvathipuram
Project Type:- Wall
Construction of Protection wall to protect Shivalayam Temple choultries, N.C.L & Z.P. Guesthouses, Gram panchayat office, T.T.D Kalyana Mandapam, and others structures in the premises of Lord Sri Lakshmi Narasimha Swamy temple area at Mattapalli (V) of Mattampalli (M) Nalgonda District.
Location:- Mattapalli
Project Type:- Wall
Package – 17: Palamoor-Rangareddy Lift Irrigation Scheme (Package-17) – Formation of Udandapur Reservoir bund from km.0.00 to km.6.30 at Udandapur (V) Jedcherla (M) Mahabubnagar-District.
Location:- Udandapur
Project Type:- Reservoir bund
We engaged in completing 3 projects of ms pipe line 1900 dia max to 700 dia, 120 km, DI pipe line 600 dia to 185 km and HDPE Pipe 300 km in primary line, 2000 km, with commissioning, 4 pump houses in deeper depths up – 20 m height. Mp projects worths of 500 crores with a manpower of 250 strength.
Project Type:- Irrigation Pipeline
NSP-NSLBC-WSIP-TS-Rehabilitation and Modernization of NS Canals From km 90.540 to 123.450 of Nagarjuna Sagar Lal Bahadur Canal, TS, India. Package No. LC-NLG-KMM-4A
Location:- Nagarjuna
Project Type:- Canal
Irrigation and CAD Department – Dindi Lift Irrigation Project – Package 3 SRVR – Earthwork Excavation and Formation of Embankment of Main canal from km. 30.000 to 45.000 including CM & CD works, Formation of Gottimukkala Reservoir under Dindi Lift Irrigation Scheme in Mahabubnagar and Nalgonda District.
Location:- Gottimukkala
Project Type:- Reservoir bund
Construction of Telangana Residential School Complex for Girls at Nerella (V) Siricilla Mandal in Karimnagar District.
Location:- Nerella
Project Type:- Residential School
Construction of Permanent building for new Polytechnic at Cherial (V&M) in Warangal Dist under RIDF(XIX) NABARD.
Location:- Warangal
Project Type:- Building
AMC Miryalaguda , Dhameracherla 10,000 MT Godown For Storage Purpose
Location:- Dhameracherla
Project Type:- Godown
APCBTMP – Construction of Agriculture Produce Storage Godown cum drying platform pedda cheruvu,
Mallampally (v), Mulugu (M)
Location:- Warangal
Project Type:- Godown
Constructions of division office building of DLIS div no.2, Chinthapally village & Nalgonda Mandal
Location:- Nalgonda
Project Type:- Building
Works going under MCL subsidiary in Lingaraj Area. In Lingaraj OCP, Lingaraj Area Overburden removal work was awarded to KCCL which is been executed by HCPL. In this contract the total awarded OB is 510 Lakh Cum with a period of 1825days.
Location:- Odisha
Project Type:- Coal Mining